Incheon Port International Passenger Terminal (인천항 국제여객선터미널)

Incheon Port International Passenger Terminal (인천항 국제여객선터미널)

클럽리치투어 0 233

  •   addr1

    57 , Gukjehangman-daero 326beon-gil, Yeonsu-gu, Incheon

  •   title

    Incheon Port International Passenger Terminal (인천항 국제여객선터미널)

  •   homepage

    www.icferry.or.kr

  •   overview

    The Incheon Port International Passenger Terminal was created to develop Incheon Port into an internationally beautiful port for tourism by constructing an international passenger pier and terminal to resolve user inconvenience caused by dual (inner and coastal) operations and increase port operation efficiency. Construction began in December 2016 and was completed in June 2019, and operations began on June 15, 2020. It has a total floor area of ​​66,789.62 ㎡ (terminal building 65,421.15 ㎡, gate building 1,368.47 ㎡) and consists of five floors and a rooftop floor.

_detailIntro
_detailInfo
Array
(
    [bo_table] => datagokr_Eng
    [page] => 8
    [sod] => desc
    [sop] => and
    [sst] => wr_datetime
    [wr_id] => 6445
)
  • 37.4240058478
  • 126.6055312353
    • Incheon Port International Passenger Terminal (인천항 국제여객선터미널)
  • 0 Comments